The porch project

It’s been a while since I’ve discussed our backyard.   Last we spoke about it, I had just sealed and enhanced our terracotta patio…

Well, let me tell ya…. A LOT has gone down since then.   A. LOT. (<-said like Loyd of Dumb & Dumber)  And I had absolutely nothing to do with it.  It was ALL Joey.  Thus, this post is more of a progress report than a how-to since I didn’t actually participate.  I just watched with admiration through the window.  It’s a tough job, but someone’s gotta do it.  😉

Basically, the changes all began with a drainage problem on our back porch.   Starting a few months ago, whenever it would rain, the water would approach the house, sometimes coming within a foot of it.  No bueno.  Joey tried to declog our existing french drains with pretty much every method he researched, but to no avail.

So, around Christmas, he spent days digging a trench and installing a drain at the west end of our porch (Ahem!  A 200-foot trench in 20 degree weather), which resulted in this nicely graveled-in drain…

That helped the flooding on that side of the porch, but as we came to find out several weeks later when it rained again, the other side continued to flood.   So, he spent many, many more days out there removing the crazy-heavy railroad ties, and installing another drain, along with a sump pump (a pump that forces the water through the drain and out to the street).

So, picture this.  He’s just spent all this time.  WEEKS working on this. Our back yard is all torn apart as you can see here…

IMG_2836

He’s exhausted and sore, but had FINALLY finished and was starting to put the yard back together again.   I get home from work and Joey meets me out on the driveway. He has a look on his face that I could only describe as “livid shock”.

Joey: “So, guess what?”

Me: “What? Are you okay?”

Joey: “No.  You’re never gonna believe this.”

Me: “What?”

Joey: “Ya know that weird electrical box on the porch post that we thought had something to do with the pool?”

Me: “Yeah, what about it?”

Joey: “Well, after I finished clearing things up back there, I took another look at it.  There was a GFI plug that had been tripped and needed to be reset, so I pushed the button to reset it.  And I heard humming coming from underground.  So, I started digging.  (pause)……..Turns out, we already have a sump pump.  And it works.  It works great.  It was just off.  Which explains the flooding.  ….I did ALL THAT WORK for NOTHING.”

O.M.G. Never have I wanted to cry for another person more.  Poor (handsome, handsome) man.

Basically, the sump pump had been buried underground about two feet which is why we never knew about it.   The existing drains weren’t clogged, the sump pump had simply turned off when the GFI plug had tripped, which explained the recent floods we’d been having (our porch hadn’t flooded for the first few months after we moved in).  Since we didn’t know we had a sump pump or that this electrical box controlled it…

(we were told by our inspector that the plug likely had something to do with the pool pump), we didn’t think to check the switch.  So, when Joey attempted to connect power to the new sump pump via that switch, he discovered it. UGH.  Painful, right??  I guess that’s what you get with old houses, though.  You just never know what’s been done before you.

So, now that we knew that the drainage problem was taken care of, we had the issue of the missing retaining wall next to the porch to contend with.   Joey was NOT going to put those nasty rotting railroad ties back, so we ended up getting stackable retaining wall stones from Lowes for about 1.78 a pop.

Joey did the whole wall himself, and I have to say that he did a fabulous job.   He said that the most difficult part was ensuring the bottom row was level in every direction.  He used sand beneath the bottom row to act as a bed for the stones and placed them down, moving them around until they were level and straight.  Then, he used more sand to back-fill each row behind the stones. To ensure that he had a straight line, he tied some rope between the columns of the patio as a guide…

IMG_2807-0

We still have to get a topper for the wall (the cement pavers are just placeholders… They’re destined for another part of our yard), but here’s where he ended up with the wall…

IMG_2835

The above shot was taken before he added a second level to the left side, which can be seen here…

He’s going to add a few more stones (once we buy them… we ran out) to even it up with the right side…

Then, we’ll be planting bushes and ground covering beyond the retaining wall to make it feel cozy and lush.

Here’s the before pictures just for reference…

I’m so impressed with him. Seriously. Other updates that he’s taken on include this screen that he built to camouflage our HVAC unit…

We based this screen on a picture that I found on Pinterest.   It’s L-shaped to still allow access to the unit, but makes it much less of an eyesore from the porch. We still have to touch up some of the stain on the corners and add one more plank to the bottom.  Then, we’ll landscape around it with bushes and gravel.   It’s sweet already, but it’ll be awesome when it’s done.    You’ll also note a start to the path we’re creating beside the screen (that’s where those rectangular pavers on top of the retaining wall will come in).  This path will go all the way around the house and will be bordered in and filled with gravel around the pavers.

That pile of decrepit wood that you see in the back of the shot is a portion of our old fence (which’ll be taken to the dump soon).   Every part of our fence has been replaced at some point in time except for this one.  It literally had 2 foot gaps in it.  It was original to the house and was rotting, and completely falling apart.  Joey replaced it recently for both aesthetic and security reasons. You can see the new fence here…

Once the menagerie of half-done projects are finished, we’ll be boxing in the columns on the porch and staining them the same color as the HVAC screen to emulate stained wood posts. Eventually all of the railroad ties along the fence will be replaced as well. I’m getting really excited about everything. And more impressed by Joey by the day.

Our porch is still in disarray as I type this, thus I have no pretty “after” shots this time.   Our pool is getting drained today in preparation for resurfacing (I’ll write another post about that) and we anticipate a bunch of dust in the process, so we’re waiting until that’s done to clean and get everything situated.   The coping needs to be replaced around the pool (ugh) and the most cost-effective option is flagstone.  The reason why I’m mentioning this now is that our plan for the retaining wall topper is to use coordinating flagstone to tie the two elements together.   Once the coping is in, we can choose our topper and get that hammered out.   And once that’s done, we can actually start to use our porch again.   (And celebration, complete with jumping and giggles (from me) will ensue)

So, anyways, y’all have a great Monday.  I have much in store for you in the posts ahead.  I’ve had a busy weekend (Heeheeheehee!)… 😉

TDC Before and After

On the fence

The first step to updating our fence is done. And I have to say that none of it was my doing. Joey gets all the credit. We’ve wanted to move up the east side of our fence since before it was even erected. Our builder provided enough fencing to bring the fence to the front of our property on the west side, but it fell even with the back corner of our house on the other side….

IMG_1330

We felt like this cut off our yard and deprived us of valuable space for storage along the side of our property.  We decided to wait until the house next door was built and their fence was up so we would only have to move the front section of our fence, rather than having to purchase a side portion as well.

Now, I’ll be honest, I don’t know all of the nitty-gritty steps involved in this project. I do know that Joey was out there for a while working on it. So, this is just a quick summary of how he did it.

Joey started by first sinking the new fence posts. He measured the locations of our existing fence posts and dug holes in the same locations but lined up with the front of the neighbors fence towards the front of our house. Next, he set the posts in the holes and poured in Quikrete.

IMG_1340

He made sure the posts were level (for which he had a little help…)…

IMG_1343 IMG_1345

And added water with the hose…

IMG_1346

And fun ensued…

IMG_1352

Then, Joey built temporary supports so that the posts would remain level as they set….

IMG_1349

While somebody else contemplated the meaning of life…

IMG_1332

Joey allowed the posts to set overnight and the next day, he gently pried the fence off of the existing posts in sections with a crow bar.  He then reattached these sections to the new posts near the front of our house.

IMG_1965

And, removed the posts by the back of our house.   Look how much space we gained…..

IMG_1966

Nice. We were thinking of creating some storage for Lucas’s toys over here. Because (when I’m not taking nice pictures for the blog) our patio actually looks like this….

IMG_1963

We also plan to plant some sort of privacy hedge to block our view of the house next door from the bedroom windows. Our next step for the fence will be staining it a nice cedar color. I can’t wait to see how much that’ll warm up the backyard. (Rubs hands together in mischeivous fashion)